feature

crossing the congo

Chevron connected two wellbores drilled from separate jack-up rigs and pulled through a gas pipeline conduit to form a nearly 4.5 mile pipeline under the Congo River submarine canyon offshore Angola. The Congo River Canyon crossing is part of the pipeline that is designed to transport up to 250 million cubic feet per day of natural gas from Blocks 0 and 14 to Chevron’s Angola LNG plant. This is the largest well-intersection project executed by Chevron.

Updated: March 2016